Group Blog Home
Group Blog Home

Recent Posts
1  2  3  4 
April 2025 - Posts

The City of Timmins, Environmental Services Department wishes to advise the public of a Sanitary Sewer Overflow at station 4.

Address: 5121 Highway 101 East
Start date: April 29, 2025
Start time: 1:18 pm
End date: TBD
End time: TBD
Volume by-passed: TBD

Municipal wastewater consists of 99% water from stormwater and homes/businesses from washing, flushing etc. When a treatment plant or treatment process is overwhelmed, a bypass or overflow can occur. These events are often caused by heavy rainfall and/or snowmelt. During a by-pass or overflow, partially treated wastewater is diverted away from a treatment process to prevent backups, overflows or damage to the system.

Residents can help mitigate flows by delaying or limiting unnecessary usage such as laundry, shower length, dishwashing etc. during rain storms.

For more information please visit www.timmins.ca

City staff would like to thank residents for their assistance in reducing water usage during this time.

Posted by Cyndee Villeneuve  at 3:38 PM
  

As of Monday, April 28, 2025, the Mattagami Region Conservation Authority has issued a Flood Warning. In response, the City’s Public Works Department has established sandbag stations to assist residents in protecting their properties.

Sandbag Station Locations:

1. Mountjoy Arena – 814 Park Ave.

2. Confederation Arena – 303 Cameron St. S.

3. Corner of Golden Ave & Crawford – South Porcupine

4. Bristol Road – between Rekela & Ruth - Porcupine

Important Reminders:

• Shovels will be provided at all locations.

• Expect possible weather-related or traffic delays, especially during peak times.

• If sandbag supplies are running low, contact Service Timmins for assistance.

 

We urge all residents to remain cautious and take the necessary precautions to stay safe.

Posted by Becky Cashmore  at 3:30 PM
  

Whitney-Tisdale Pump Station #2 Overflow Report

Address: 57 Evans Street
Start date: April 29, 2025
Start time: 3:01 AM
End date: on-going
End time: on-going
Volume by-passed: to be determined

Support Our Wastewater System:
During spring melt and heavy rain events, the increased water entering the sewer system can exceed the capacity of our wastewater system, leading to potential overflows. Residents can help by conserving water, managing runoff on their properties, and keeping our pipes clear—no wipes in the pipes! Learn more about how the system works and what actions you can take at www.timmins.ca.

Posted by Cyndee Villeneuve  at 10:33 AM
  

Whitney-Tisdale Pump Station #1 Overflow Report

Address: 202 Goldrush Street
Start date: April 29, 2025
Start time: 3:30 AM
End date: on-going
End time: on-going
Volume by-passed: to be determined

Support Our Wastewater System:
During spring melt and heavy rain events, the increased water entering the sewer system can exceed the capacity of our wastewater system, leading to potential overflows. Residents can help by conserving water, managing runoff on their properties, and keeping our pipes clear—no wipes in the pipes! Learn more about how the system works and what actions you can take at www.timmins.ca.

Posted by Cyndee Villeneuve  at 10:30 AM
  

Whitney-Tisdale Pump Station #3 Overflow Report

Address: 174 Essa Avenue
Start date: April 29, 2025
Start time: 6:12 AM
End date: on-going
End time: on-going
Volume by-passed: to be determined

Support Our Wastewater System:
During spring melt and heavy rain events, the increased water entering the sewer system can exceed the capacity of our wastewater system, leading to potential overflows. Residents can help by conserving water, managing runoff on their properties, and keeping our pipes clear—no wipes in the pipes! Learn more about how the system works and what actions you can take at www.timmins.ca.

Posted by Cyndee Villeneuve  at 10:28 AM
  

Mattagami Water Pollution Control Plant Secondary Bypass Report

Address: 551 Airport Road
Start date: April 29, 2025
Start time: 4:08 am
End date: on-going
End time: on-going
Volume by-passed: on-going

Support Our Wastewater System:
During spring melt and heavy rain events, the increased water entering the sewer system can exceed the capacity of our wastewater system, leading to potential overflows. Residents can help by conserving water, managing runoff on their properties, and keeping our pipes clear—no wipes in the pipes! Learn more about how the system works and what actions you can take at www.timmins.ca.

Posted by Cyndee Villeneuve  at 10:25 AM
  

Mattagami Water Pollution Control Plant Raw Overflow Report

Address: 551 Airport Road
Start date: April 29, 2025
Start time: 5:05 am
End date: on-going
End time: on-going
Volume by-passed: to be determined

Support Our Wastewater System:
During spring melt and heavy rain events, the increased water entering the sewer system can exceed the capacity of our wastewater system, leading to potential overflows. Residents can help by conserving water, managing runoff on their properties, and keeping our pipes clear—no wipes in the pipes! Learn more about how the system works and what actions you can take at www.timmins.ca.

Posted by Cyndee Villeneuve  at 10:19 AM
  

Click to download job description

Part-Time Housekeeping/Laundry Aides

How to apply

To apply for this position, applications must be received by the Human Resources Department no later than 4:00 pm on the closing date of May 2, 2025.

APPLY NOW

Posted by AnneMarie Fournier  On Apr 25, 2025 at 3:37 PM
  
The flags at Timmins City Hall and other municipal buildings will be lowered to half-mast on Monday, April 28, 2025 in honour of the National Day of Mourning in Canada, also known as Workers’ Day of Mourning.

The National Day of Mourning is dedicated to the memory of those who have lost their lives in a workplace tragedy, and to acknowledge the impact of work-related injury and illness.

The City of Timmins is committed to providing our employees with a healthy and safe workplace. Through our Health and Safety Department, we work dutifully to train, enforce, standardize, and ensure that safety protocols are in place that prevent both physical and mental injury and illness.
Posted by Amanda Dyer  On Apr 23, 2025 at 11:55 AM
  

Mattagami Water Pollution Control Plant Secondary Bypass Report

Address: 551 Airport Road
Start date: April 18, 2025
Start time: 11:25 am
End date: April 18, 2025
End time: 2:40 pm
Volume by-passed: 2209.267 m3

Support Our Wastewater System:
During spring melt and heavy rain events, the increased water entering the sewer system can exceed the capacity of our wastewater system, leading to potential overflows. Residents can help by conserving water, managing runoff on their properties, and keeping our pipes clear—no wipes in the pipes! Learn more about how the system works and what actions you can take at www.timmins.ca.

Posted by Cyndee Villeneuve  On Apr 22, 2025 at 3:43 PM
  
1  2  3  4 
 
  • © 2018 City of Timmins. All Rights Reserved.