September 2025 - Posts
Click to download job description
Part-Time Operator
How to apply
To apply for this position, applications must be received by the Human Resources Department no later than 4:00 pm on the closing date of September 19, 2025.
APPLY NOW
AnneMarie Fournier
Click to download job description
Temporary Full-Time Payroll Co-ordinator
How to apply
To apply for this position, applications must be received by the Human Resources Department no later than 4:00 pm on the closing date of September 19, 2025.
APPLY NOW
AnneMarie Fournier
The City of Timmins’ annual Orange Bus campaign returns this year with a special tribute to the late Indigenous artist, Shaun Hedican. Shaun, a member of the Loon Clan and Eabametoong First Nation northeast of Thunder Bay, was the principal artist behind the mural at the Timmins Museum: National Exhibition Centre.
Shaun shared his talent and teachings with the Timmins’ community through his artwork. His museum mural, and now the City’s orange bus, features a traditional Turtle Island motif in the woodland style for which he was known. In many Indigenous origin stories, the turtle represents identity, wisdom, safety, and culture. The name “Turtle Island” can refer to the continent of North America, Canada specifically, and the belief of the turtle carrying the world on its back.
In addition to the Orange Bus campaign, both Timmins’ landmark signs in downtown Timmins and at the Timmins Museum: National Exhibition Centre, will be illuminated for the National Day for Truth and Reconciliation on September 30. On September 30, consider wearing an orange shirt purchased from a local Indigenous store or organization. Share the story of Orange Shirt Day, and reflect on the role each of us plays in healing and reconciliation.
For more information, visit the City of Timmins’ Indigenous Relations and Inclusion page: www.timmins.ca/find_or_learn_about/indigenous_relations_and_inclusion.
Amanda Dyer
Click to download job description
Job Posting: Volunteer Firefighters
Application Package: Application Package
How to apply
To apply for this position, applications must be received by the Human Resources Department no later than 4:00 pm on the closing date of October 16, 2025.
APPLY NOW
AnneMarie Fournier
Over the next 25 years, Timmins is anticipated to grow. Shifts in population, employment, and housing will change the landscape of our community. Imagine what Timmins will be like in the year 2051.
The City of Timmins is advancing into Phase Two of our Growth Management Study. Guided by feedback collected through our online survey, stakeholder meetings, and the first public open house, the City’s Planning Division, together with Watson & Associates Economists Ltd. and J.L. Richards & Associates Ltd., have prepared a draft Growth Management Study that is now ready for public review.
Public Engagement is a key part of this process. As we move into Phase Two, the City of Timmins invites residents to review the document and continue to share their thoughts and ideas about the future growth and development of Timmins. A second public open house will be held on Tuesday, September 23, 2025 to present the document.
The Growth Management Study will provide a long-term vision and strategy for Timmins with consideration to local population, housing, and employment forecasts. It will outline where and how residential and employment growth should occur to best benefit the community, and will also provide the foundation for the City’s Official Plan Review.
Public Open House
Date: Tuesday, September 23, 2025
Time: 6:00 p.m. to 8:00 p.m.
Location: McIntyre Community Centre (Auditorium), 85 McIntyre Rd., Timmins, ON P4N 8R8
The purpose of this session is to present key findings and direction of the draft Growth Management Study, answer questions from the public, and gather feedback to help refine the study and guide the next stage of planning.
For more information on the City’s Growth Management Study, visit: www.timmins.ca/our_services/building_and_planning/planning/timmins_growth_management_study
Amanda Dyer
Important clarification regarding the recent announcement about compliance issues at the Mattagami Water Pollution Control Plant, made more than two years ago between 2018-2023.
Here’s what you need to know:
- The Mattagami Water Pollution Control Plant treats wastewater (i.e. sewage). It does NOT supply drinking water.
- The intake for the city’s drinking water is located upstream from the wastewater facility.
- Wastewater is not drinking water.
- At NO time was the city’s drinking water impacted by these concerns
- Over the last 4 years, the city’s average drinking water inspection rating was 95%.
The City took immediate corrective action, and all wastewater concerns associated with the Mattagami Water Pollution Control Plant were promptly resolved in 2023.
Both the drinking water system and the wastewater collection annual reports are made public for transparency: https://www.timmins.ca/our_services/water_and_sewer/water_compliance_reports
Amanda Dyer
Accessibility improvements at the McIntyre Community Centre’s main entrance begin Monday, September 8, 2025. Construction is expected to continue until the end of October.
Work will require that the main entrance of the arena be closed. Access will be available through the arena’s side parking lot, and the accessible rear entrance with elevator access will be available. The McIntyre Coffee Shop entrance will also remain open and be unaffected.
During construction, the exterior stairs will be replaced and the main entrance ramp upgraded to meet the current Accessibility for Ontarians with Disabilities Act (AODA) requirements. This includes improvements to the ramp slope, width, handrails, and landing design.
The City of Timmins appreciates the community’s patience and cooperation while work is completed.
Amanda Dyer
The City of Timmins Environmental Services department wishes to advise the Public of hydrant flushing/watermain cleaning activities in the following areas.
Affected Areas:
South Porcupine & Porcupine Area starting on September 4, 2025 from Porcupine Bridge heading east to Falcon Rd. Please refer to map for flushing areas
Time of Disruption:
September 4, 2025 to October 3, 2025
Homeowners and businesses may experience short-term loss in water pressure or experience brown or rust-coloured water following the testing. It is recommended not to drink or wash laundry with the discoloured water. While it is not harmful to your health, it can stain laundry. Should this occur, it is advised to turn off your tap for 10-20 minutes in order to allow the crew to complete the test. Once the test is complete and the work crew has left the area, turn on the COLD water tap closest to the source (usually your laundry tub tap) and let it run for approximately 15-20 minutes or until the water colour has returned to normal.
City staff would like to thank residents for their patience and cooperation during this necessary process, and advise that if there are any questions, concerns or requests for additional information, they may contact the Service Timmins at 705-264-1331. After-hours emergencies should be directed to 705-264-1201.

Becky Cashmore
The City of Timmins is extending the closure of the Archie Dillon Sportsplex Pool until September 30, 2025 to allow additional time to complete scheduled maintenance.
Access to the facility must remain restricted in order to expedite work and ensure public safety. This delay was not anticipated, and the City apologizes for any inconvenience this may cause to residents and facility users.
Residents who have registered for private swim lessons will be contacted directly by pool staff to reschedule. Registration for community swim lessons will still be held on September 16, 2025.
Amanda Dyer
Planned essential maintenance will be taking place at the Mattagami Water Pollution Control Plant which requires the use of the raw sewage pumping station overflow line on September 3, 2025 for approximately six (6) hours (8AM to 2PM). This overflow is required to conduct essential maintenance to the primary clarifier distribution channel. The Ministry of the Environment, Conservation and Parks has been notified and samples will be collected.
Mattagami Water Pollution Control Plant
Address: 551 Airport Road
Start date: September 3, 2025
Start time: 9:34 am
End date: September 3, 2025
End time: 2:59 pm
Volume by-passed: 4,102.403
We’re reminding residents that only human waste and small amounts of toilet paper should be flushed. Baby wipes, feminine products, dental floss, cotton swabs, cleaning and disinfectant wipes, toilet bowl scrubbers and paper towels might be labeled "flushable," but they are not!
These products do not break down in the sewer system and can cause plugs in sewer pipes and pumps, resulting in sewer backups, overflows, costly cleanups and sewage equipment replacement. While it may seem convenient to dispose of various materials in this manner, it can have severe consequences for our sewage works. Please dispose of non-flushable items in the waste receptacle, ensuring they are properly bagged.
Thank you for your cooperation and understanding in this matter. By working together to practice responsible waste disposal, we can help maintain the integrity of our sewage system.
Cyndee Villeneuve
|