Rehabilitation work on the Mattagami River Bridge and Porcupine River Bridge begins May 06, 2024 with mobilization and installation of signs for both bridges and traffic control set up.
Asphalt removal is scheduled for Thursday, May 09 and Friday, May 10, 2024.
Work on both bridges is being carried out at the same time to expedite the work schedule. Motorists should be prepared to slow and merge. Both bridges will have lanes reduced to one way in each direction.
Learn more at: www.timmins.ca/connecting_link